Potomac Lux Potomac Lux
Home Management Library

First-Year Homeowners

Buying a Home in McLean, VA? Check the Land, Taxes, and Hidden Estate Costs

McLean buyer's checklist: Fairfax County expansion and permit reviews, stream restrictions, assessments, toll roads, redevelopment, estate costs and utilities.

By Potomac Lux · Published

Research and methodology

An established home and mature landscaping in warm natural light, illustrating the importance of understanding the land and the house before purchasing
The beauty of the property is only part of the story. Understand the records, limits and responsibilities before buying.

Direct answer

What should buyers investigate before buying an older home, teardown lot, or estate in McLean, Virginia?

Look up the exact parcel's annual assessed value, tax district and current rate; verify old renovations and nearby redevelopment in Fairfax County PLUS; map streams, Resource Protection Areas and drainage; confirm whether proposed clearing or redevelopment requires a site-related plan, especially at the 2,500-square-foot land-disturbance threshold; verify well and septic versus public utilities; and budget the full cost of maintaining a large property. Requirements differ by parcel.

Your property research

A checklist you can actually use.

Open this page during a showing or due diligence. Check items as you investigate. Selections stay on this browser only, not in a Potomac Lux account.

0 / 31 reviewed

Researching a real address? Keep inspections, permits and the answers you uncover together in a free Home Record. Start your Home Record. Your checked boxes remain in this browser and are not automatically transferred.

01 · LOCAL BUYER INTELLIGENCE

The half-acre looks perfect. What does Fairfax County allow you to do with it?

McLean includes older housing, larger wooded lots, renovated properties, high-value estates and newly built infill homes. When buying a place you intend to expand or replace, the purchase price and lot dimensions do not tell you what you may actually build.

Fairfax County's land-disturbance guidance says land-disturbing work totaling 2,500 square feet or more is regulated under its Erosion and Stormwater Management Ordinance and generally requires an approved site-related plan before disturbance. The rules can matter for demolition, new impervious surfaces, grading, driveways and some additions. Smaller work can still require zoning, building, tree or Resource Protection Area approvals.

County guidance emphasizes that new impervious coverage and drainage are major considerations in residential infill. A neighboring property having a large new house does not establish that your lot can support the same plan.

The half-acre looks perfect. What does Fairfax County allow you to do with it? checklist

02 · LOCAL BUYER INTELLIGENCE

Permitting the addition can be a project of its own

In Fairfax County, expanding an older McLean house can involve more than a standard building permit. The County's residential addition and alteration process runs through PLUS. Depending on the design, officials from zoning, building plan review, site review, wastewater, fire safety and the Health Department (for a private well or septic system) may need to review the application. The county also publishes a separate site-related review process and a sequence of screening, technical review, comments, resubmission, coordination and payment. The burden varies significantly by project; an ordinary interior renovation is not equivalent to an addition on a streamside lot.

The practical risk is underestimating design revisions, specialist work, sequencing and the time between submitting plans and actually receiving a permit. The county's published development review metrics and homeowner participation guidance can help you ask informed questions, but no single processing time applies to every project.

An RPA waiver, if required, must be approved before a building permit for an affected minor addition can be issued; more extensive grading can trigger a separate plan. That is a specific example of why a seller's or contractor's broad promise that an addition will be 'easy to permit' needs independent verification.

Permitting the addition can be a project of its own checklist

03 · LOCAL BUYER INTELLIGENCE

The stream behind the trees may change your plans

Fairfax County's Chesapeake Bay Preservation Ordinance identifies Resource Protection Areas, or RPAs, around certain streams, wetlands and water bodies. These areas can limit land disturbance, vegetation clearing and construction, and may require water-quality impact analysis or an exception.

County map layers are a screening tool, not always a site-specific survey. The county says a field-verified RPA boundary study may be required for site-related plans where the mapped resource area appears. An expansive wooded lot may therefore contain land that cannot be treated as a blank slate.

Fairfax County also publishes a Flood Risk Awareness Tool. Floodplain risk is one concern; surface runoff from neighboring slopes, driveways or new construction is another. Flood maps alone don't establish the likelihood of basement water at an individual house.

The stream behind the trees may change your plans checklist

04 · LOCAL BUYER INTELLIGENCE

The next teardown could be next door

Fairfax County's online PLUS system lets the public search addresses for building permits, zoning applications, inspections and other land-development records. The county's Development Tracker, launched in September 2026, also lets residents find nearby active construction sites, approved plans and other projects.

This is especially useful if you're considering an older house among recent infill development. You need to understand not only the subject property's renovation history but also what's permitted or planned around it. A construction permit is not proof that a project will finish on schedule; a pending application is not a final approval.

Ask about outdoor equipment, generator placement, mature-tree work, retaining walls and access routes. Those ordinary details affect the ownership experience on a large or closely developed site.

The next teardown could be next door checklist

05 · LOCAL BUYER INTELLIGENCE

Fairfax County taxes work differently from Montgomery County taxes

Fairfax County reassesses real property annually, with January 1 as the effective date for assessments. That's different from Maryland's three-year reassessment cycle. The county's adopted tax-year 2026 base real-estate tax rate is $1.12 per $100 of assessed value, after a quarter-cent reduction announced in May 2026. Additional levies, including the Stormwater Service District's $0.0325 per $100, and any parcel-specific special district rates can affect the total.

A useful illustration: at an assessed value of $2,000,000, the $1.12 base rate alone works out to $22,400 a year, before stormwater and any other applicable tax district charges. This is an illustration, not a quote for a particular home; actual assessed value, tax district, credits or relief and future rates matter.

Fairfax County offers an address-searchable Real Estate Assessment site and a tax-rate table. Buyers should check the individual tax district and 2026 assessment rather than importing Bethesda assumptions or automatically using the seller's monthly escrow.

Fairfax County taxes work differently from Montgomery County taxes checklist

06 · LOCAL BUYER INTELLIGENCE

Know which utility systems you are actually buying

McLean-area homes vary in their service arrangements. Public water and sewer are common in developed neighborhoods, but a buyer should never assume every estate-style property is connected. Properties using individual wells or onsite sewage systems require records, inspections and ongoing maintenance of a different kind.

Fairfax County Health Department says most onsite sewage systems without special state discharge permits must have their septic tanks pumped at least once every five years. Alternative onsite systems may involve additional operator and inspection requirements. Anyone considering adding bedrooms or replacing a house on septic should confirm the approved capacity and area before closing.

Inside the house, ask about the age and history of the roof, electrical service, HVAC, water heating, generator, pumps and major equipment. A property with exceptional finishes can still have ordinary infrastructure with a short remaining service life.

Know which utility systems you are actually buying checklist

07 · LOCAL BUYER INTELLIGENCE

Your daily route can carry a second monthly bill: tolls

McLean's exact location and your destination determine which roads make sense. Near Route 267, the Dulles Toll Road is a separately tolled facility; the Metropolitan Washington Airports Authority offers a route-based toll calculator. For drivers choosing I-495 Express Lanes, toll prices vary dynamically with traffic and trip length, and special HOV-3+ rules apply with a properly configured E-ZPass Flex. The northern extension of the 495 Express Lanes opened in November 2025, with new connections near the Dulles Toll Road and George Washington Memorial Parkway.

I-66 Inside the Beltway has a different schedule: VDOT identifies weekday toll periods eastbound 5:30–9:30 a.m. and westbound 3–7 p.m. Outside those periods, that segment operates without a toll; qualifying HOV-3+ vehicles with E-ZPass Flex can travel toll free during toll periods. Not everyone in McLean uses I-66, Route 267, or tolled 495 lanes. Many trips have untolled options that may take longer.

Price the trip you will actually make, both ways and at your real commute times. A hypothetical $12 each way for 20 workdays is $480 per month, but that is an illustration, not a quoted or typical McLean toll. Dynamic pricing and exemptions can change the result considerably. Compare the monthly toll total with actual travel-time savings before making a homebuying decision.

Your daily route can carry a second monthly bill: tolls checklist

08 · LOCAL BUYER INTELLIGENCE

The house should fit your actual life, not just the brochure

McLean offers access to major Northern Virginia employment centers, but trips toward Tysons, Arlington, DC and other destinations vary dramatically by route and time. A buyer should test the commute rather than relying on a listing's distance to a major road. Property-specific traffic and noise are also worth checking.

Fairfax County's My Neighborhood tool provides official assigned-school information by address. Buyers should verify the specific assigned schools for their parcel and confirm district guidance rather than assume an adjacent street belongs to the same attendance area.

Fairfax Police documented a series of vehicle break-ins and thefts in parts of the McLean Police District during 2025. That is evidence of incidents, not evidence that every McLean block has a high or rising crime rate. Review the property's actual security arrangements, lighting, garage use and available incident records if these matter to your household.

After gathering the facts, ask a practical question: Does this particular house justify its ongoing expense and limitations for the way you'll use it?

The house should fit your actual life, not just the brochure checklist
One important distinction

This is educational guidance, not a legal opinion, a property-specific approval, or a replacement for a home inspection. Confirm requirements for the exact address with the appropriate authority. Request qualified professional advice where the evidence warrants it.

Official references

Sources and homeowner references

Related guidance

Keep the house's history with the house

A fine property deserves better records.

Collect the survey, inspections, plans, permits, tax assumptions, tree and drainage decisions, utilities and maintenance history in your free Potomac Lux Home Record. Keep the whole story with the property.

START YOUR FREE HOME RECORD →

Free to use. Paid projects and hands-on services are priced separately.